I had Geoffry helping me to set the post in, we ran string lines etc for height and to level against. The first post as always was the most awkward, it needed to be 2 metres above ground, and Geoffry was quite happy to hold all 2.5 metres of 4 x 4 timber up while the concrete was poured around it, but I had doubts about the actual placement of it while it was wavering around.
The simple solution was to nail a board across at the 2 metre mark, and just let it sit on the ground, centred in the hole to the right height and level. I keep forgetting that there was a time when I didn’t know things, and had to be shown stuff. It was the first time Geoffry had seen it done, after that, he was away. He had the corner posts all marked and ready on his own, and set in the holes. It was even more terrific when you understand Geoffry doesn’t speak english, his pijin has such a strong island dialect I can’t understand him, and he has no way of understanding me at all. But, show him once, and there isn’t a problem.

Geoffery setting the post height guide

Geoffery with post

Post in place

alt=""id="BLOGGER_PHOTO_ID_5503888712329385650" />So we had a fun afternoon, I was giving out at Andrew as usual, he gives it back as well, his thumb has healed really well since he cut it in half. I suggested he should have left it split open, then we could call him Andrew 3 thumbs, but he didn’t think that was such a good idea.
We dug the post holes a fair while back, I don’t think I’ve mentioned it before, but every morning I’ve been doing my Francis of Asissi good deed and rescuing all the frogs and snakes that have fallen into the holes over night. Luckily the snakes have been all Solomon boas, similar to the one I posted the pic of last week, and fairly small. I’m not sure if I’d have been rescuing a tree snake or any of the other poisonous ones. So here are a couple of pics of the lucky frogs.



We found a few more earth snakes today, cleaning out the holes before the concrete went in, all the same as I’ve posted. The guys don’t jump back so much now they have seen me handle them, and I’ve managed to stop them killing them as well. All I need now is for someone to tell me they are deadly venomous.
The compost heap is heating up nicely, more than finger depth into it is almost too hot to touch, I’m hoping for rain soon to cool things down, well, to keep it at a reasonable temperature. Just damp enough to keep the microbes happy and to stop any fires starting. Now all we have to do is keep the crew to a weekly schedule of turning the heaps, and collecting sawdust and chicken manure to keep the process going. It’s one of the things that can get frustrating here, there is no sense of future planning, if you have a compost heap, and it is working, why start another each week? The fact that it takes about 4 – 6 weeks for the heap to be ready, and we will probably be using about 5 cu m a week, once the present heap runs out, if we wait till then to start another, what do we do for the couple of months it will take us to have more ready?
I’d like to have at least 4 of the bins full all the time, with one being filled as the others get used, but that concept is going to take a while to get working.











.jpg)
.jpg)
.jpg)
.jpg)
.jpg)

.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)


